Fujairah Plant

Restoration by Mechanical/Utility Isolation In-Charge

It allows user to view the Permit and Restore all the Equipment(S)

  1. Login as Mechanical Isolation In-charge and isolate all the equipment.
  2. Permit will appear from the Energy isolation section of Permit Dashboard.
  3. User can select Action from the ‘Select Action’ drop-down list.
  4. By default, all pre-filled data will be automatically filled and it will be disabled.
  5. click on view/edit button User have to fill all required field of Mechanical isolation details form.
  6. After fill all the required field User can able to save the Mechanical isolation details form.
  7. User can save the isolation details by click on “Save as Draft” button.