Grey IU & GU Plants
Restoration By Instrumental Isolation In-Charge
Objective: It allows user to view the Permit and Restore all the Equipment(S)
- Login as Instrumentation Isolation In-Charge and Isolate all the equipment.
- Permit will appear from the Energy isolation section of Permit Dashboard.
- User can select Action from the ‘Select Action’ drop-down list.
- By default, all pre-filled data will be automatically filled and it will be disabled.
- Click on view/edit button User have to fill all required field of Instrumentation isolation details form.
- After fill all the required field User can able to save the Instrumentation isolation details form.
- User can save the isolation details by click on “Save as Draft” button.
Image 1